PROJECT OVERVIEW: The Factory 02 (F02) project involves the development of a facility on a 7.5-hectare site in the Nordics, with approximately 14,000 m² to be built in Phase 1. The site will be developed in two phases, each featuring six bioreactors. The full project cycle is estimated to take 47 months. OBJECTIVES AND STRUCTURE: The project follows a Front-End Loading (FEL) process to thoroughly understand the project and reduce changes during execution. This will take 12 months from January to December 2025, covering two key phases: alternative assessment and process design freeze, with the end goal of an advanced conceptual design package. SCOPE AND PROJECT DELIVERABLES: An advanced conceptual design package, cost estimate, and integrated project plans that cover permitting, engineering, procurement, and construction schedules.
Sopimus
- Tarjousten määräaika
- 19.12.2024 klo 12.00
- Sopimuskausi
- alkaen 1.1.2025
CPV-luokitus
71240000Arkkitehti-, insinööri- ja suunnittelupalvelut (pääluokitus)71300000Insinööripalvelut
Ilmoitukset
- 22.11.2024 Hankintailmoitus
The value of the procurement has been incorrectly stated. The correct estimated value of the acquisition is EUR 3,000,000.
Tiedot ovat julkisten hankintojen ilmoituskanava Hilmasta (hankintailmoitukset.fi). Tarkista hankinnan ehdot aina alkuperäisestä ilmoituksesta ja hankinta-asiakirjoista.