AvoinTavarahankintaEU-kynnysarvon ylittävä

OLKT Pratt&Whitney FT8 turbine control system replacement

Fingrid Oyj, Helsinki

Kuvaus

With this invitation to participate, Fingrid is seeking capable and interested suppliers for the replacement of the Pratt&Whitney FT8 gas turbine control system in Olkiluoto Finland. This delivery includes a new gas turbine automation systems, which will replace existing Woodward Micronet gas turbine automation systems at the Olkiluoto Reserve Gas Turbine Plant. The Plant has two Pratt&Whitney FT8-1 TwinPac Gas turbine units, which are installed 2007. Both units have original and identical Micronet systems. Annex 1 "OLKT FT8 turbine control system replacement scope of supply" specifies the scope of the procurement.

Sopimus

Osallistumishakemusten määräaika
27.8.2025 klo 12.00
Sopimuskausi
1.1.2026–31.12.2026

CPV-luokitus

  • 42112300 Kaasuturbiinit (pääluokitus)

Ilmoitukset

  1. 20.8.2025 Hankintailmoitus

Tiedot ovat julkisten hankintojen ilmoituskanava Hilmasta (hankintailmoitukset.fi). Tarkista hankinnan ehdot aina alkuperäisestä ilmoituksesta ja hankinta-asiakirjoista.