OLKT Pratt&Whitney FT8 turbine control system replacement
Fingrid Oyj, Helsinki
Kuvaus
With this invitation to participate, Fingrid is seeking capable and interested suppliers for the replacement of the Pratt&Whitney FT8 gas turbine control system in Olkiluoto Finland. This delivery includes a new gas turbine automation systems, which will replace existing Woodward Micronet gas turbine automation systems at the Olkiluoto Reserve Gas Turbine Plant. The Plant has two Pratt&Whitney FT8-1 TwinPac Gas turbine units, which are installed 2007. Both units have original and identical Micronet systems. Annex 1 "OLKT FT8 turbine control system replacement scope of supply" specifies the scope of the procurement.
Sopimus
- Osallistumishakemusten määräaika
- 27.8.2025 klo 12.00
- Sopimuskausi
- 1.1.2026–31.12.2026
CPV-luokitus
42112300Kaasuturbiinit (pääluokitus)
Ilmoitukset
- 20.8.2025 Hankintailmoitus
Tiedot ovat julkisten hankintojen ilmoituskanava Hilmasta (hankintailmoitukset.fi). Tarkista hankinnan ehdot aina alkuperäisestä ilmoituksesta ja hankinta-asiakirjoista.